Selected Highlights:
- WH24-02 intersected high-grade mineralization within the western portion of the Whistler Deposit:
Main Zone intercept of 120 meters (m) at 0.72 grams per tonne (g/t) gold (Au), 0.16 percent (%) (Cu) and 0.83 g/t silver (Ag), or 1.00 g/t gold equivalent (AuEq), from 291 m to 411 m down hole;- Including higher-grade intercepts:
- 40 m at 1.28 g/t AuEq from 297 m downhole; and
- 20 m at 1.26 g/t AuEq from 357 m downhole.
- Total (EPA:) mineralized envelope comprises 274 m at 0.71 g/t AuEq (0.48 g/t Au, 0.12% Cu and 0.86 g/t Ag) from 227 m to 501 m below surface.
- Assays remain pending for an additional three drill holes from the Company’s recently completed 2024 drilling program which exceeded 4,000 meters for the season.
AuEq is calculated consistent with the methodology outlined in Whistler Project technical report “S-K 1300 Technical Report Summary Initial Assessment for the Whistler Project, |
I want to again acknowledge our professional and hard-working technical team that have…
Click Here to Read the Full Original Article at All News…